Trail Crew
Trail Builder
Design a mountain bike trail for a client, solving a math problem for every segment you build.
- Level
- Intermediate – Advanced
- Time
- 30-45 min
- Algebra
- Geometry
- Trigonometry
- Statistics
- Calculus
Details
Students run a trail crew. They take a work order from a client — a youth bike camp, a city greenway, an enduro race — and design a trail that fits the budget, meets the client’s requirements, and finishes at exactly the right elevation. Every segment they add comes with a math problem to solve first.
- Math matched to the class. Pick Algebra I, Geometry, Algebra II, Precalculus, Statistics, or Calculus, and each segment brings its own problem — slopes, the Pythagorean theorem, jump trajectories, banking angles, expected value, derivatives. A wrong answer gets a hint before the solution is shown.
- Real planning, real constraints. Students balance money, length, difficulty, and elevation while a live profile shows where the trail is headed. I can throw in change orders mid-round — a sponsor donation, a permit fee, a moved finish line — so they have to re-plan.
- A test ride with consequences. A rider rolls the die on every tougher segment. Crashes, flats, and washouts cost money or points, so risky designs have to be worth it.
- Explain the design. Each round ends with a score and a medal, then students name the trail and write a pitch to the client explaining, with numbers, why it works. Finished trails build into a network as they rank up from Trail Rookie to Master Builder.
Field notes
Every feature is a line item
A jump like this gets planned long before a shovel hits the dirt. Trail Builder asks students the questions a builder works through first.
- 01 · SlopeHow steep is the takeoff? Rise over run sets how fast riders need to be going and how hard the segment is rated.
- 02 · CostThat stone wall took time and money. Every segment has to fit the client’s budget, so a big feature has to be worth it.
- 03 · AirWhere does the rider come down? Jump trajectories are one of the problems a segment can bring, and the test ride shows what happens if the numbers are off.